Kinghurst Bypass kerb saves the day during floods

Historically when breaking waves deposited water on the promenade at Trearddur Bay in Anglesey the water ran down the road and flooded the town centre

 

Working the Atkins we developed a solution. By providing an exceptionally large road hump with a huge Kinghurst Bypass Kern along its edge. We tamed the beast.

The water runs down the road and is stopped by the road hump. The camber guides the flood water to the Kinghurst. The Kinghurst collects it and channels it past the hump and sends it back onto the beach.

The above image shows the unit performing perfectly in the recent Storm Denis